{"id":61397,"date":"2023-12-08T20:25:32","date_gmt":"2023-12-08T11:25:32","guid":{"rendered":"https:\/\/monolith.law\/cs\/?p=61397"},"modified":"2024-03-26T06:50:10","modified_gmt":"2024-03-25T21:50:10","slug":"the-law-of-project-involving-subcontractor-fails","status":"publish","type":"post","link":"https:\/\/monolith.law\/cs\/it\/the-law-of-project-involving-subcontractor-fails","title":{"rendered":"Jak\u00e9 jsou pr\u00e1vn\u00ed d\u016fsledky, pokud projekt zapoj\u00edc\u00ed subdodavatele (op\u011btovn\u011b pov\u011b\u0159en\u00e9) sel\u017ee"},"content":{"rendered":"\n<p>Projekty v\u00fdvoje syst\u00e9m\u016f nejsou v\u017edy uzav\u0159eny pouze obchodn\u00edmi transakcemi mezi u\u017eivatelem zad\u00e1vaj\u00edc\u00edm pr\u00e1ci a dodavatelem p\u0159ij\u00edmaj\u00edc\u00edm objedn\u00e1vku. V n\u011bkter\u00fdch p\u0159\u00edpadech m\u016f\u017ee b\u00fdt vyu\u017eito subdodavatelstv\u00ed (op\u011btovn\u00e9 zad\u00e1n\u00ed), nap\u0159\u00edklad s o\u010dek\u00e1v\u00e1n\u00edm dal\u0161\u00edho dopln\u011bn\u00ed person\u00e1lu nebo zaveden\u00ed technick\u00fdch znalost\u00ed, kter\u00e9 p\u016fvodn\u00ed dodavatel nem\u00e1. V takov\u00fdch p\u0159\u00edpadech se m\u016f\u017ee st\u00e1t, \u017ee v p\u0159\u00edpad\u011b n\u00e1hl\u00e9ho zastaven\u00ed projektu se spor nebude omezovat pouze na u\u017eivatele a dodavatele. Jak se rozhoduje o odpov\u011bdnosti, pokud projekt postupoval na z\u00e1klad\u011b slo\u017eit\u00fdch vztah\u016f mezi t\u0159emi nebo v\u00edce stranami a n\u00e1hle se zastavil? V tomto \u010dl\u00e1nku vysv\u011btl\u00edme rizika spojen\u00e1 s ho\u0159en\u00edm projekt\u016f specifick\u00fdch pro subdodavatelstv\u00ed (op\u011btovn\u00e9 zad\u00e1n\u00ed) a pokyny pro \u0159e\u0161en\u00ed takov\u00fdch p\u0159\u00edpad\u016f.<\/p>\n\n\n\n<div id=\"ez-toc-container\" class=\"ez-toc-v2_0_53 counter-hierarchy ez-toc-counter ez-toc-grey ez-toc-container-direction\">\n<div class=\"ez-toc-title-container\">\n<span class=\"ez-toc-title-toggle\"><\/span><\/div>\n<nav><ul class='ez-toc-list ez-toc-list-level-1 ' ><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-1\" href=\"https:\/\/monolith.law\/cs\/it\/the-law-of-project-involving-subcontractor-fails\/#Vyuziti_subdodavatelu_outsourcingu_Jak_zmeni_pravni_aspekty_vyvoje_systemu\" title=\"Vyu\u017eit\u00ed subdodavatel\u016f (outsourcingu): Jak zm\u011bn\u00ed pr\u00e1vn\u00ed aspekty v\u00fdvoje syst\u00e9m\u016f?\">Vyu\u017eit\u00ed subdodavatel\u016f (outsourcingu): Jak zm\u011bn\u00ed pr\u00e1vn\u00ed aspekty v\u00fdvoje syst\u00e9m\u016f?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-2\" href=\"https:\/\/monolith.law\/cs\/it\/the-law-of-project-involving-subcontractor-fails\/#Jak_daleko_saha_ucinnost_zruseni_smlouvy_v_pripade_ze_projekt_selze_a_smlouva_je_zrusena\" title=\"Jak daleko sah\u00e1 \u00fa\u010dinnost zru\u0161en\u00ed smlouvy v p\u0159\u00edpad\u011b, \u017ee projekt sel\u017ee a smlouva je zru\u0161ena?\">Jak daleko sah\u00e1 \u00fa\u010dinnost zru\u0161en\u00ed smlouvy v p\u0159\u00edpad\u011b, \u017ee projekt sel\u017ee a smlouva je zru\u0161ena?<\/a><ul class='ez-toc-list-level-3'><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-3\" href=\"https:\/\/monolith.law\/cs\/it\/the-law-of-project-involving-subcontractor-fails\/#Dulezite_soudni_pripady_tykajici_se_rozsahu_dopadu_zruseni\" title=\"D\u016fle\u017eit\u00e9 soudn\u00ed p\u0159\u00edpady t\u00fdkaj\u00edc\u00ed se rozsahu dopadu zru\u0161en\u00ed\">D\u016fle\u017eit\u00e9 soudn\u00ed p\u0159\u00edpady t\u00fdkaj\u00edc\u00ed se rozsahu dopadu zru\u0161en\u00ed<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-4\" href=\"https:\/\/monolith.law\/cs\/it\/the-law-of-project-involving-subcontractor-fails\/#Je_nutne_rozdelit_moznost_naroku_na_odmenu_od_subdodavatele_subkontraktora_podle_duvodu_ukonceni\" title=\"Je nutn\u00e9 rozd\u011blit mo\u017enost n\u00e1roku na odm\u011bnu od subdodavatele (subkontraktora) podle d\u016fvodu ukon\u010den\u00ed\">Je nutn\u00e9 rozd\u011blit mo\u017enost n\u00e1roku na odm\u011bnu od subdodavatele (subkontraktora) podle d\u016fvodu ukon\u010den\u00ed<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-5\" href=\"https:\/\/monolith.law\/cs\/it\/the-law-of-project-involving-subcontractor-fails\/#Poznamky_k_ukonceni_smlouvy_zahrnujici_subdodavatele_opetovne_zadavane_zakazky\" title=\"Pozn\u00e1mky k ukon\u010den\u00ed smlouvy zahrnuj\u00edc\u00ed subdodavatele (op\u011btovn\u011b zad\u00e1van\u00e9 zak\u00e1zky)\">Pozn\u00e1mky k ukon\u010den\u00ed smlouvy zahrnuj\u00edc\u00ed subdodavatele (op\u011btovn\u011b zad\u00e1van\u00e9 zak\u00e1zky)<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-6\" href=\"https:\/\/monolith.law\/cs\/it\/the-law-of-project-involving-subcontractor-fails\/#Shrnuti\" title=\"Shrnut\u00ed\">Shrnut\u00ed<\/a><\/li><\/ul><\/nav><\/div>\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Vyuziti_subdodavatelu_outsourcingu_Jak_zmeni_pravni_aspekty_vyvoje_systemu\"><\/span>Vyu\u017eit\u00ed subdodavatel\u016f (outsourcingu): Jak zm\u011bn\u00ed pr\u00e1vn\u00ed aspekty v\u00fdvoje syst\u00e9m\u016f?<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<figure class=\"wp-block-image\"><img decoding=\"async\" src=\"https:\/\/monolith.law\/wp-content\/uploads\/2019\/11\/shutterstock_1091544947-1024x683.jpg\" alt=\"\" class=\"wp-image-5577\" \/><figcaption class=\"wp-element-caption\">V projektech v\u00fdvoje syst\u00e9m\u016f je nezbytn\u00e1 spolupr\u00e1ce mezi dodavatelem a u\u017eivatelem.<\/figcaption><\/figure>\n\n\n\n<p>Spory, kter\u00e9 zahrnuj\u00ed t\u0159i nebo v\u00edce stran, mohou vy\u00fastit v komplikovan\u00e9 situace. I v takov\u00fdch p\u0159\u00edpadech je d\u016fle\u017eit\u00e9 m\u00edt z\u00e1kladn\u00ed pov\u011bdom\u00ed o tom, jak se spory obvykle vyv\u00edjej\u00ed mezi dv\u011bma stranami &#8211; u\u017eivatelem a dodavatelem. Projekty v\u00fdvoje syst\u00e9m\u016f obvykle postupuj\u00ed v t\u011bsn\u00e9 spolupr\u00e1ci mezi technick\u00fdmi odborn\u00edky, tedy dodavateli, a u\u017eivateli, kte\u0159\u00ed maj\u00ed bohat\u00e9 znalosti o intern\u00edch procesech ve firm\u011b. B\u011bhem dlouhodob\u00fdch projekt\u016f je vy\u017eadov\u00e1na t\u011bsn\u00e1 koordinace mezi ob\u011bma stranami. Dobr\u00fdm p\u0159\u00edkladem tohoto je situace, kdy projekt sel\u017ee kv\u016fli u\u017eivateli. Podrobn\u011bji o tomto t\u00e9matu diskutujeme v n\u00e1sleduj\u00edc\u00edm \u010dl\u00e1nku.<\/p>\n\n\n\n<p><a href=\"https:\/\/monolith.law\/corporate\/interrruption-of-system-development\" target=\"_blank\" rel=\"noreferrer noopener\">https:\/\/monolith.law\/corporate\/interrruption-of-system-development[ja]<\/a><\/p>\n\n\n\n<p>V uveden\u00e9m \u010dl\u00e1nku vysv\u011btlujeme, \u017ee i kdy\u017e u\u017eivatel po\u017e\u00e1d\u00e1 o zastaven\u00ed v\u00fdvoje syst\u00e9mu, pr\u00e1vn\u00ed odpov\u011bdnost za to nemus\u00ed nutn\u011b padnout na u\u017eivatele. Nen\u00ed jednoduch\u00e9 rozhodnout, kdo by m\u011bl n\u00e9st odpov\u011bdnost za ne\u00fasp\u011bch projektu. Pokud existuje neshoda v pochopen\u00ed mezi ob\u011bma stranami, odpov\u011bdnost m\u016f\u017ee snadno p\u0159ej\u00edt na druhou stranu a spor se m\u016f\u017ee zkomplikovat. Term\u00edny jako &#8220;povinnost spolupr\u00e1ce&#8221; na stran\u011b u\u017eivatele a &#8220;povinnost \u0159\u00edzen\u00ed projektu&#8221; na stran\u011b dodavatele se \u010dasto pou\u017e\u00edvaj\u00ed v rozhodnut\u00edch soud\u016f v minul\u00fdch p\u0159\u00edpadech. Tato z\u00e1kladn\u00ed forma pr\u00e1vn\u00edch aspekt\u016f v\u00fdvoje syst\u00e9m\u016f, kter\u00e1 zahrnuje &#8220;soupe\u0159en\u00ed&#8221; mezi t\u011bmito dv\u011bma povinnostmi, se st\u00e1v\u00e1 je\u0161t\u011b slo\u017eit\u011bj\u0161\u00ed, kdy\u017e jsou zapojeni subdodavatel\u00e9 (outsourcing).<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Jak_daleko_saha_ucinnost_zruseni_smlouvy_v_pripade_ze_projekt_selze_a_smlouva_je_zrusena\"><\/span>Jak daleko sah\u00e1 \u00fa\u010dinnost zru\u0161en\u00ed smlouvy v p\u0159\u00edpad\u011b, \u017ee projekt sel\u017ee a smlouva je zru\u0161ena?<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p>Pokud se nap\u0159\u00edklad z n\u011bjak\u00e9ho d\u016fvodu stane, \u017ee smlouva mezi u\u017eivatelem a dodavatelem je zru\u0161ena, ot\u00e1zkou se st\u00e1v\u00e1 rozsah jej\u00edho dopadu. Pokud se cel\u00fd projekt t\u00fdk\u00e1 pouze probl\u00e9m\u016f mezi ob\u011bma stranami, \u00fa\u010dinky zru\u0161en\u00ed smlouvy se omez\u00ed na zru\u0161en\u00ed povinnost\u00ed, kter\u00e9 ob\u011b strany v\u016f\u010di sob\u011b maj\u00ed, tedy na povinnost &#8220;n\u00e1vratu k p\u016fvodn\u00edmu stavu&#8221;. Av\u0161ak pokud by se vztahy mezi subdodavatelem, kter\u00fd nepodepsal p\u0159\u00edmou smlouvu, a p\u016fvodn\u00edm dodavatelem ukon\u010dily najednou, mohlo by to pro subdodavatele znamenat nep\u0159edv\u00eddan\u00e9 \u0161kody a v n\u011bkter\u00fdch p\u0159\u00edpadech by to mohlo b\u00fdt i krut\u00e9. Nicm\u00e9n\u011b, pokud by p\u016fvodn\u00ed dodavatel a subdodavatel byli st\u00e1le v\u00e1z\u00e1ni, p\u0159esto\u017ee projekt, na kter\u00e9m se subdodavatel pod\u00edlel, ji\u017e selhal, mohlo by to b\u00fdt tak\u00e9 nezdrav\u00e9. Jak bychom m\u011bli tento bod uspo\u0159\u00e1dat?<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Dulezite_soudni_pripady_tykajici_se_rozsahu_dopadu_zruseni\"><\/span>D\u016fle\u017eit\u00e9 soudn\u00ed p\u0159\u00edpady t\u00fdkaj\u00edc\u00ed se rozsahu dopadu zru\u0161en\u00ed<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<figure class=\"wp-block-image\"><img decoding=\"async\" src=\"https:\/\/monolith.law\/wp-content\/uploads\/2019\/11\/shutterstock_1518387830-1024x675.jpg\" alt=\"\" class=\"wp-image-5579\" \/><figcaption class=\"wp-element-caption\">Co jsou soudn\u00ed p\u0159\u00edpady t\u00fdkaj\u00edc\u00ed se rozsahu dopadu zru\u0161en\u00ed smlouvy?<\/figcaption><\/figure>\n\n\n\n<p>Pro rozsah dopadu zru\u0161en\u00ed mezi u\u017eivatelem a dodavatelem je referen\u010dn\u00edm dokumentem rozsudek Tokijsk\u00e9ho okresn\u00edho soudu ze dne 24. prosince 2012 (rok Heisei 24). V tomto soudn\u00edm p\u0159\u00edpadu byl probl\u00e9mem rozsah dopadu dohodnut\u00e9ho zru\u0161en\u00ed mezi u\u017eivatelem a p\u016fvodn\u00edm dodavatelem, ale bylo rozhodnuto, \u017ee tato \u00fa\u010dinnost ovlivn\u00ed tak\u00e9 vztah mezi p\u016fvodn\u00edm dodavatelem a subdodavatelem (op\u011btovn\u011b zadavatelem).<\/p>\n\n\n\n<blockquote class=\"wp-block-quote\">\n<p>V tomto soudn\u00edm p\u0159\u00edpadu, i kdy\u017e bylo projeveno z\u00e1m\u011br zru\u0161it \u010d\u00e1st subdodavatelsk\u00e9 smlouvy t\u00fdkaj\u00edc\u00ed se t\u00e9to pr\u00e1ce, je p\u0159edpokl\u00e1dan\u00fdm faktem (3) U, \u017ee \u010d\u00e1st p\u016fvodn\u00ed smlouvy t\u00fdkaj\u00edc\u00ed se t\u00e9to pr\u00e1ce byla dohodnuta k zru\u0161en\u00ed dne 20. dubna 2009 (rok Heisei 21), a <u>kv\u016fli tomuto dohodnut\u00e9mu zru\u0161en\u00ed<\/u>, \u010d\u00e1st subdodavatelsk\u00e9 smlouvy t\u00fdkaj\u00edc\u00ed se t\u00e9to pr\u00e1ce, <u>proto\u017ee neexistuje p\u0159edm\u011bt pln\u011bn\u00ed, je p\u0159irozen\u011b pova\u017eov\u00e1na za ukon\u010denou<\/u>, tak\u017ee nen\u00ed jin\u00e9 mo\u017enosti ne\u017e \u0159\u00edci, \u017ee pr\u00e1vn\u00ed v\u00fdznam nem\u00e1 n\u00e1sleduj\u00edc\u00ed projev z\u00e1m\u011bru zru\u0161it ze strany \u017ealovan\u00e9ho. <\/p>\n<cite>Tokijsk\u00fd okresn\u00ed soud, 25. prosince 2012 (rok Heisei 24)<\/cite><\/blockquote>\n\n\n\n<p>V tomto rozsudku bylo rozhodnuto, \u017ee vliv dohodnut\u00e9ho zru\u0161en\u00ed znamen\u00e1, \u017ee subdodavatelsk\u00e1 smlouva je &#8220;p\u0159irozen\u011b pova\u017eov\u00e1na za ukon\u010denou&#8221;. Pokud jde o pr\u00e1ci s n\u00edzkou univerz\u00e1lnost\u00ed, kter\u00e1 nem\u00e1 smysl prov\u00e1d\u011bt, pokud nen\u00ed zad\u00e1n\u00ed od u\u017eivatele, lze o\u010dek\u00e1vat, \u017ee tato z\u00e1v\u011br bude je\u0161t\u011b v\u00edce opr\u00e1vn\u011bn\u00fd. Mimochodem, v tomto rozsudku bylo rozhodnuto, \u017ee subdodavatel (op\u011btovn\u011b zadavatel) nem\u016f\u017ee po\u017eadovat odm\u011bnu, ale pokud by se v\u0161echny p\u0159\u00edpady dohodnut\u00e9ho zru\u0161en\u00ed \u0159e\u0161ily t\u00edmto zp\u016fsobem, mohlo by to b\u00fdt problematick\u00e9 z hlediska spravedlnosti soudn\u00edho \u0159\u00edzen\u00ed. Proto se zd\u00e1, \u017ee normy pro posuzov\u00e1n\u00ed t\u011bchto p\u0159\u00edpad\u016f nejsou je\u0161t\u011b pln\u011b stanoveny.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Je_nutne_rozdelit_moznost_naroku_na_odmenu_od_subdodavatele_subkontraktora_podle_duvodu_ukonceni\"><\/span>Je nutn\u00e9 rozd\u011blit mo\u017enost n\u00e1roku na odm\u011bnu od subdodavatele (subkontraktora) podle d\u016fvodu ukon\u010den\u00ed<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p>V p\u0159edchoz\u00edm soudn\u00edm p\u0159\u00edpadu se zd\u00e1, \u017ee bylo nazna\u010deno, \u017ee v p\u0159\u00edpad\u011b dohodnut\u00e9ho ukon\u010den\u00ed mezi u\u017eivatelem a p\u016fvodn\u00edm dodavatelem, subdodavatel (subkontraktor) nem\u016f\u017ee v z\u00e1sad\u011b po\u017eadovat odm\u011bnu. Nicm\u00e9n\u011b se zd\u00e1, \u017ee je nutn\u00e9 tento bod rozd\u011blit a uspo\u0159\u00e1dat podle d\u016fvodu ukon\u010den\u00ed, aby se do\u0161lo k spravedliv\u011bj\u0161\u00edmu z\u00e1v\u011bru. Nap\u0159\u00edklad, pokud byla smlouva ukon\u010dena kv\u016fli chyb\u011b p\u016fvodn\u00edho dodavatele, v p\u0159\u00edpad\u011b, kdy bylo dohodnuto ukon\u010den\u00ed bez souhlasu subdodavatele (subkontraktora), se zd\u00e1 b\u00fdt spravedliv\u00e9 povolit n\u00e1rok na odm\u011bnu subdodavatele. Na druhou stranu, pokud je rozhodnuto, \u017ee p\u016fvodn\u00ed dodavatel nem\u00e1 \u017e\u00e1dnou chybu, (zejm\u00e9na pokud subdodavatel (subkontraktor) uzav\u0159el smlouvu o d\u00edlo), p\u0159ijet\u00ed odm\u011bny nen\u00ed samoz\u0159ejm\u011b mo\u017en\u00e9, a tak n\u00e1rok na odm\u011bnu nem\u016f\u017ee b\u00fdt povolen. Tato ot\u00e1zka rizika v bezchybn\u00e9m vztahu se t\u00fdk\u00e1 oblasti zvan\u00e9 &#8220;riziko nesouc\u00ed&#8221; v ob\u010dansk\u00e9m pr\u00e1vu.<\/p>\n\n\n\n<blockquote class=\"wp-block-quote\">\n<p>\u010cl\u00e1nek 536<br>1. S v\u00fdjimkou p\u0159\u00edpad\u016f uveden\u00fdch v p\u0159edchoz\u00edch dvou \u010dl\u00e1nc\u00edch, pokud dlu\u017en\u00edk nem\u016f\u017ee splnit sv\u016fj dluh kv\u016fli d\u016fvod\u016fm, kter\u00e9 nelze p\u0159i\u010d\u00edst ob\u011bma stran\u00e1m, nem\u00e1 pr\u00e1vo p\u0159ijmout protislu\u017ebu.<\/p>\n<\/blockquote>\n\n\n\n<p>Samotn\u00e9 riziko nesouc\u00ed je jedn\u00edm z velmi obecn\u00fdch t\u00e9mat t\u00fdkaj\u00edc\u00edch se ob\u010dansk\u00e9ho pr\u00e1va, kter\u00e9 se net\u00fdk\u00e1 pouze IT a v\u00fdvoje syst\u00e9m\u016f. Typick\u00fdm p\u0159\u00edkladem je nap\u0159\u00edklad situace, kdy zbo\u017e\u00ed zanikne p\u0159ed dod\u00e1n\u00edm kv\u016fli n\u00e1hl\u00e9mu velk\u00e9mu p\u0159\u00edrodn\u00edmu katastrof\u011b v r\u00e1mci kupn\u00ed smlouvy. Vztah mezi p\u016fvodn\u00edm dodavatelem a subdodavatelem (subkontraktorem) tak\u00e9 zahrnuje ot\u00e1zku, jak regulovat &#8220;bezchybn\u00fd vztah&#8221;, a zd\u00e1 se, \u017ee se bude uplat\u0148ovat ustanoven\u00ed o riziku nesouc\u00ed.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Poznamky_k_ukonceni_smlouvy_zahrnujici_subdodavatele_opetovne_zadavane_zakazky\"><\/span>Pozn\u00e1mky k ukon\u010den\u00ed smlouvy zahrnuj\u00edc\u00ed subdodavatele (op\u011btovn\u011b zad\u00e1van\u00e9 zak\u00e1zky)<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p>V souvislosti s v\u00fd\u0161e uveden\u00fdm t\u00e9matem m\u016f\u017ee b\u00fdt v smlouv\u011b uzav\u0159en\u00e9 mezi p\u016fvodn\u00edm dodavatelem a subdodavatelem (op\u011btovn\u011b zad\u00e1van\u00e9 zak\u00e1zky) zahrnuta klauzule, podle kter\u00e9 se platba prov\u00e1d\u00ed a\u017e po p\u0159ijet\u00ed platby od u\u017eivatele. Av\u0161ak, i kdy\u017e je takov\u00e1 klauzule zahrnuta, o\u010dek\u00e1v\u00e1 se, \u017ee lh\u016fta pro platbu subdodavateli (op\u011btovn\u011b zad\u00e1van\u00e9 zak\u00e1zky) nastane, jakmile se p\u0159edpokl\u00e1d\u00e1, \u017ee p\u016fvodn\u00ed dodavatel nebude schopen p\u0159ijmout platbu. Jin\u00fdmi slovy, i kdy\u017e je takov\u00e1 klauzule zahrnuta, existuj\u00ed omezen\u00ed pro odm\u00edtnut\u00ed platby subdodavateli (op\u011btovn\u011b zad\u00e1van\u00e9 zak\u00e1zky) na z\u00e1klad\u011b tohoto d\u016fvodu. V r\u00e1mci pr\u00e1vn\u00edch probl\u00e9m\u016f souvisej\u00edc\u00edch s subdodavateli (op\u011btovn\u011b zad\u00e1van\u00e9 zak\u00e1zky) by bylo vhodn\u00e9 vz\u00edt v \u00favahu tak\u00e9 tento aspekt spolu s rozsahem dopadu ukon\u010den\u00ed smlouvy.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Shrnuti\"><\/span>Shrnut\u00ed<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p>Pokud se projekt v\u00fdvoje syst\u00e9mu posouv\u00e1 vp\u0159ed s zapojen\u00edm subdodavatel\u016f (op\u011btovn\u00fdch zak\u00e1zek), p\u0159\u00edpady se mohou st\u00e1t slo\u017eit\u00fdmi. Proto je obt\u00ed\u017en\u00e9 dos\u00e1hnout uspokojiv\u00e9ho \u0159e\u0161en\u00ed prost\u0159ednictv\u00edm jednoduch\u00fdch postup\u016f, jako je uvalen\u00ed povinnosti nahradit ztr\u00e1tu na stranu, kter\u00e1 poru\u0161ila povinnosti, vych\u00e1zej\u00edc\u00ed z &#8220;povinnosti spolupr\u00e1ce&#8221; u\u017eivatele nebo &#8220;povinnosti \u0159\u00edzen\u00ed projektu&#8221; dodavatele. Komplikovanost p\u0159\u00edpad\u016f &#8220;ho\u0159\u00edc\u00edch&#8221; projekt\u016f s v\u00edce ne\u017e t\u0159emi z\u00fa\u010dastn\u011bn\u00fdmi stranami se zd\u00e1 b\u00fdt velmi dob\u0159e zobrazena v aspektech jako je rozsah dopadu ukon\u010den\u00ed smlouvy. V t\u00e9to souvislosti se zd\u00e1 b\u00fdt d\u016fle\u017eit\u00e9 nejen \u010dekat na dal\u0161\u00ed soudn\u00ed p\u0159\u00edpady, ale tak\u00e9 formulovat argumenty na z\u00e1klad\u011b konkr\u00e9tn\u00edch p\u0159\u00edpad\u016f.<br> <\/p>\n","protected":false},"excerpt":{"rendered":"<p>Projekty v\u00fdvoje syst\u00e9m\u016f nejsou v\u017edy uzav\u0159eny pouze obchodn\u00edmi transakcemi mezi u\u017eivatelem zad\u00e1vaj\u00edc\u00edm pr\u00e1ci a dodavatelem p\u0159ij\u00edmaj\u00edc\u00edm objedn\u00e1vku. V n\u011bkter\u00fdch p\u0159\u00edpadech m\u016f\u017ee b\u00fdt vyu\u017eito subdodavatelst [&hellip;]<\/p>\n","protected":false},"author":32,"featured_media":63185,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[16],"tags":[19,31],"acf":[],"_links":{"self":[{"href":"https:\/\/monolith.law\/cs\/wp-json\/wp\/v2\/posts\/61397"}],"collection":[{"href":"https:\/\/monolith.law\/cs\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/monolith.law\/cs\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/monolith.law\/cs\/wp-json\/wp\/v2\/users\/32"}],"replies":[{"embeddable":true,"href":"https:\/\/monolith.law\/cs\/wp-json\/wp\/v2\/comments?post=61397"}],"version-history":[{"count":2,"href":"https:\/\/monolith.law\/cs\/wp-json\/wp\/v2\/posts\/61397\/revisions"}],"predecessor-version":[{"id":63186,"href":"https:\/\/monolith.law\/cs\/wp-json\/wp\/v2\/posts\/61397\/revisions\/63186"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/monolith.law\/cs\/wp-json\/wp\/v2\/media\/63185"}],"wp:attachment":[{"href":"https:\/\/monolith.law\/cs\/wp-json\/wp\/v2\/media?parent=61397"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/monolith.law\/cs\/wp-json\/wp\/v2\/categories?post=61397"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/monolith.law\/cs\/wp-json\/wp\/v2\/tags?post=61397"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}