{"id":61119,"date":"2023-12-04T11:16:10","date_gmt":"2023-12-04T02:16:10","guid":{"rendered":"https:\/\/monolith.law\/tr\/?p=61119"},"modified":"2026-04-14T21:47:43","modified_gmt":"2026-04-14T12:47:43","slug":"project-management-duties","status":"publish","type":"post","link":"https:\/\/monolith.law\/tr\/it\/project-management-duties","title":{"rendered":"Sistem Geli\u015ftirmede Proje Y\u00f6netimi Y\u00fck\u00fcml\u00fcl\u00fc\u011f\u00fc Nedir?"},"content":{"rendered":"\n<p>Sistem geli\u015ftirme, i\u015fi sipari\u015f eden kullan\u0131c\u0131lar ve sipari\u015fi alan sat\u0131c\u0131lar aras\u0131nda kar\u015f\u0131l\u0131kl\u0131 i\u015fbirli\u011fi gerektiren bir s\u00fcre\u00e7tir.<\/p>\n\n\n\n<p>\u015eirketlerin kulland\u0131\u011f\u0131 IT sistemlerini geli\u015ftiren projelerin t\u00fcm\u00fc, her zaman planland\u0131\u011f\u0131 veya beklenildi\u011fi gibi ilerlemez. Aksine, b\u00fcy\u00fck ya da k\u00fc\u00e7\u00fck bir\u00e7ok sorun ve zorlukla kar\u015f\u0131la\u015f\u0131l\u0131rken, bu sorunlar\u0131n her biri tek tek a\u015f\u0131larak ilerlenir. Bu durumda, kullan\u0131c\u0131 ve sat\u0131c\u0131 taraf\u0131n\u0131n ad\u0131mlar\u0131n\u0131 uyumlu hale getirme \u00e7abas\u0131 elbette \u00f6nemlidir, ancak \u00e7at\u0131\u015fma durumlar\u0131n\u0131 \u00f6ng\u00f6ren kriz y\u00f6netimi de \u00f6nemlidir.<\/p>\n\n\n\n<p>Hukuki a\u00e7\u0131dan bak\u0131ld\u0131\u011f\u0131nda, her iki taraf\u0131n hangi y\u00fck\u00fcml\u00fcl\u00fckleri ta\u015f\u0131d\u0131\u011f\u0131n\u0131 ve kar\u015f\u0131 tarafa hangi haklar\u0131 ileri s\u00fcrebilece\u011fini belirlemek, kriz y\u00f6netiminin ilk ad\u0131m\u0131d\u0131r. Bu makalede, sat\u0131c\u0131 taraf\u0131n\u0131n bir dizi projeye kar\u015f\u0131 hangi hukuki y\u00fck\u00fcml\u00fcl\u00fckleri ta\u015f\u0131d\u0131\u011f\u0131, proje y\u00f6netimi y\u00fck\u00fcml\u00fcl\u00fckleri \u00fczerinde durularak a\u00e7\u0131klanacakt\u0131r.<\/p>\n\n\n\n<div id=\"ez-toc-container\" class=\"ez-toc-v2_0_53 counter-hierarchy ez-toc-counter ez-toc-grey ez-toc-container-direction\">\n<div class=\"ez-toc-title-container\">\n<span class=\"ez-toc-title-toggle\"><\/span><\/div>\n<nav><ul class='ez-toc-list ez-toc-list-level-1 ' ><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-1\" href=\"https:\/\/monolith.law\/tr\/it\/project-management-duties\/#Tedarikci_Tarafinin_Proje_Yonetimi_Yukumlulugu_Nedir\" title=\"Tedarik\u00e7i Taraf\u0131n\u0131n Proje Y\u00f6netimi Y\u00fck\u00fcml\u00fcl\u00fc\u011f\u00fc Nedir?\">Tedarik\u00e7i Taraf\u0131n\u0131n Proje Y\u00f6netimi Y\u00fck\u00fcml\u00fcl\u00fc\u011f\u00fc Nedir?<\/a><ul class='ez-toc-list-level-3'><li class='ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-2\" href=\"https:\/\/monolith.law\/tr\/it\/project-management-duties\/#Kullanici_Tarafinin_Isbirligi_Yukumlulugu\" title=\"Kullan\u0131c\u0131 Taraf\u0131n\u0131n \u0130\u015fbirli\u011fi Y\u00fck\u00fcml\u00fcl\u00fc\u011f\u00fc\">Kullan\u0131c\u0131 Taraf\u0131n\u0131n \u0130\u015fbirli\u011fi Y\u00fck\u00fcml\u00fcl\u00fc\u011f\u00fc<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-3'><a class=\"ez-toc-link ez-toc-heading-3\" href=\"https:\/\/monolith.law\/tr\/it\/project-management-duties\/#Proje_Yonetimi_Kolay_Degildir\" title=\"Proje Y\u00f6netimi Kolay De\u011fildir\">Proje Y\u00f6netimi Kolay De\u011fildir<\/a><\/li><\/ul><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-4\" href=\"https:\/\/monolith.law\/tr\/it\/project-management-duties\/#Proje_Yonetimi_Yukumluluk_Ihlali_Durumunda_Ne_Olabilir\" title=\"Proje Y\u00f6netimi Y\u00fck\u00fcml\u00fcl\u00fck \u0130hlali Durumunda Ne Olabilir?\">Proje Y\u00f6netimi Y\u00fck\u00fcml\u00fcl\u00fck \u0130hlali Durumunda Ne Olabilir?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-5\" href=\"https:\/\/monolith.law\/tr\/it\/project-management-duties\/#Proje_Yonetimi_Yukumlulugunu_Belirten_Yargi_Karari\" title=\"Proje Y\u00f6netimi Y\u00fck\u00fcml\u00fcl\u00fc\u011f\u00fcn\u00fc Belirten Yarg\u0131 Karar\u0131\">Proje Y\u00f6netimi Y\u00fck\u00fcml\u00fcl\u00fc\u011f\u00fcn\u00fc Belirten Yarg\u0131 Karar\u0131<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-6\" href=\"https:\/\/monolith.law\/tr\/it\/project-management-duties\/#Sozlesme_Imzalanmadan_Once_de_Yukumlu_Olabilecek_Proje_Yonetimi_Gorevlerini_Gosteren_Mahkeme_Karari\" title=\"S\u00f6zle\u015fme \u0130mzalanmadan \u00d6nce de Y\u00fck\u00fcml\u00fc Olabilecek Proje Y\u00f6netimi G\u00f6revlerini G\u00f6steren Mahkeme Karar\u0131\">S\u00f6zle\u015fme \u0130mzalanmadan \u00d6nce de Y\u00fck\u00fcml\u00fc Olabilecek Proje Y\u00f6netimi G\u00f6revlerini G\u00f6steren Mahkeme Karar\u0131<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-7\" href=\"https:\/\/monolith.law\/tr\/it\/project-management-duties\/#Ozet_Proje_Yonetimi_Yukumluluk_Ihlali_ile_Ilgili_Sorunlar_Icin_Avukata_Danisin\" title=\"\u00d6zet: Proje Y\u00f6netimi Y\u00fck\u00fcml\u00fcl\u00fck \u0130hlali ile \u0130lgili Sorunlar \u0130\u00e7in Avukata Dan\u0131\u015f\u0131n\">\u00d6zet: Proje Y\u00f6netimi Y\u00fck\u00fcml\u00fcl\u00fck \u0130hlali ile \u0130lgili Sorunlar \u0130\u00e7in Avukata Dan\u0131\u015f\u0131n<\/a><\/li><\/ul><\/nav><\/div>\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Tedarikci_Tarafinin_Proje_Yonetimi_Yukumlulugu_Nedir\"><\/span>Tedarik\u00e7i Taraf\u0131n\u0131n Proje Y\u00f6netimi Y\u00fck\u00fcml\u00fcl\u00fc\u011f\u00fc Nedir?<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<figure class=\"wp-block-image size-full is-resized\"><img decoding=\"async\" loading=\"lazy\" width=\"735\" height=\"490\" src=\"https:\/\/monolith.law\/tr\/wp-content\/uploads\/sites\/24\/2026\/04\/project-management-duties-2.jpg\" alt=\"\" class=\"wp-image-79761\" style=\"aspect-ratio:1.5;width:840px;height:auto\" srcset=\"https:\/\/monolith.law\/tr\/wp-content\/uploads\/sites\/24\/2026\/04\/project-management-duties-2.jpg 735w, https:\/\/monolith.law\/tr\/wp-content\/uploads\/sites\/24\/2026\/04\/project-management-duties-2-300x200.jpg 300w, https:\/\/monolith.law\/tr\/wp-content\/uploads\/sites\/24\/2026\/04\/project-management-duties-2-250x167.jpg 250w\" sizes=\"(max-width: 735px) 100vw, 735px\" \/><\/figure>\n\n\n\n<p>\u00d6ncelikle, tedarik\u00e7i taraf\u0131n\u0131n proje y\u00f6netimi y\u00fck\u00fcml\u00fcl\u00fc\u011f\u00fcn\u00fcn i\u00e7eri\u011fine bakal\u0131m.<\/p>\n\n\n\n<p>Yarg\u0131 kararlar\u0131na g\u00f6re, proje y\u00f6netimi y\u00fck\u00fcml\u00fcl\u00fc\u011f\u00fcn\u00fcn i\u00e7eri\u011fi a\u015fa\u011f\u0131daki gibidir:<\/p>\n\n\n\n<p>&#8211; Anla\u015fmaya uygun olarak geli\u015ftirme \u00e7al\u0131\u015fmalar\u0131n\u0131 ilerletirken, s\u00fcrekli olarak ilerleme durumunu y\u00f6netme ve geli\u015ftirme \u00e7al\u0131\u015fmalar\u0131n\u0131 engelleyen fakt\u00f6rleri bulmaya \u00e7al\u0131\u015fma ve bunlara uygun \u015fekilde m\u00fcdahale etme y\u00fck\u00fcml\u00fcl\u00fc\u011f\u00fc<\/p>\n\n\n\n<div class=\"wp-block-group is-layout-flow wp-block-group-is-layout-flow\"><div class=\"wp-block-group__inner-container\">\n<p>Bu, tedarik\u00e7inin, projeyi s\u00f6zle\u015fmeye dayal\u0131 olarak belirlenen program dahilinde ilerletmesi ve duruma ba\u011fl\u0131 olarak kullan\u0131c\u0131ya, geli\u015ftirmenin sorunsuz ilerlemesi i\u00e7in giri\u015fimde bulunmas\u0131 gerekti\u011fini ifade eder.<\/p>\n<\/div><\/div>\n\n\n\n<p>&#8211; Kullan\u0131c\u0131n\u0131n geli\u015ftirmeye kat\u0131l\u0131m\u0131n\u0131 da uygun \u015fekilde y\u00f6netme ve sistem geli\u015ftirme konusunda uzman bilgisi olmayan bir kullan\u0131c\u0131n\u0131n geli\u015ftirme \u00e7al\u0131\u015fmalar\u0131n\u0131 engelleyici eylemler yapmas\u0131n\u0131 \u00f6nlemek i\u00e7in kullan\u0131c\u0131ya giri\u015fimde bulunma y\u00fck\u00fcml\u00fcl\u00fc\u011f\u00fc<\/p>\n\n\n\n<p>Bu, tedarik\u00e7inin, kullan\u0131c\u0131n\u0131n karar vermesi gereken konular ve \u00e7\u00f6z\u00fclmesi gereken endi\u015fe konular\u0131 hakk\u0131nda sorunlar\u0131 ve s\u00fcreleri belirtmesi, kullan\u0131c\u0131n\u0131n karar vermesi gecikirse ortaya \u00e7\u0131kan engelleri belirtmesi, kullan\u0131c\u0131n\u0131n karar vermesini te\u015fvik etmek i\u00e7in tedarik\u00e7inin tavsiyede bulunmas\u0131, geli\u015ftirme ilerlemesine ba\u011fl\u0131 olarak kabul edilemez taleplerin olmas\u0131 durumunda, nedenlerini tamamen a\u00e7\u0131klamas\u0131 ve kullan\u0131c\u0131n\u0131n taleplerini reddetmesi anlam\u0131na gelir.<\/p>\n\n\n\n<p>Bu \u015fekilde, tedarik\u00e7i taraf\u0131n\u0131n, geli\u015ftirme \u00e7al\u0131\u015fmalar\u0131n\u0131 ilerletirken ayn\u0131 zamanda kullan\u0131c\u0131n\u0131n karar vermesini te\u015fvik etme ve sistem geli\u015ftirmenin ba\u015far\u0131l\u0131 olmas\u0131n\u0131 sa\u011flama \u00e7abas\u0131 i\u00e7inde olma y\u00fck\u00fcml\u00fcl\u00fc\u011f\u00fc vard\u0131r.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Kullanici_Tarafinin_Isbirligi_Yukumlulugu\"><\/span>Kullan\u0131c\u0131 Taraf\u0131n\u0131n \u0130\u015fbirli\u011fi Y\u00fck\u00fcml\u00fcl\u00fc\u011f\u00fc<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<p>Ancak, sistem geli\u015ftirmede, tedarik\u00e7inin tek tarafl\u0131 olarak t\u00fcm y\u00fck\u00fcml\u00fcl\u00fckleri \u00fcstlenmesi s\u00f6z konusu de\u011fildir. Sonu\u00e7ta, sipari\u015f veren taraf\u0131n \u015firketinde kullan\u0131lacak bir IT sistemi oldu\u011fundan, sipari\u015f veren taraf i\u00e7in de bu sistem geli\u015ftirme projesi &#8220;ba\u015fkas\u0131n\u0131n i\u015fi&#8221; olmamal\u0131d\u0131r.<\/p>\n\n\n\n<p>Sistem geli\u015ftirme yeteneklerine ve organizasyonel yeteneklere g\u00fcvenerek d\u0131\u015f uzmanlar\u0131 kullanmak olsa bile, i\u00e7eriden y\u00f6neti\u015fim uygulanmal\u0131d\u0131r. D\u0131\u015f uzmanlar\u0131n yeteneklerini ortaya \u00e7\u0131karmak i\u00e7in \u00e7aba g\u00f6stermeden, tamamen ba\u015fkas\u0131n\u0131n i\u015fi olarak gerekli \u00fcr\u00fcnleri teslim etmek gibi bir \u015fey imkans\u0131zd\u0131r. Bu anlamda, kullan\u0131c\u0131 taraf\u0131n\u0131n da sistem geli\u015ftirmeye i\u015fbirli\u011fi yapma y\u00fck\u00fcml\u00fcl\u00fc\u011f\u00fc vard\u0131r.<\/p>\n\n\n\n<p>Kullan\u0131c\u0131 taraf\u0131n\u0131n yerine getirmesi gereken i\u015fbirli\u011fi y\u00fck\u00fcml\u00fcl\u00fckleri a\u015fa\u011f\u0131daki gibi olabilir:<\/p>\n\n\n\n<p>\u3000\u2460 Kullan\u0131c\u0131n\u0131n aktif olarak risk analizi yapmas\u0131 ve i\u00e7 g\u00f6r\u00fc\u015flerin uygun \u015fekilde d\u00fczenlenmesi ve g\u00f6r\u00fc\u015flerin birle\u015ftirilmesi sonucunda taleplerin tedarik\u00e7iye iletilmesi<\/p>\n\n\n\n<p>\u3000\u2461 \u00dcr\u00fcnlerin kontrol edilmesi<\/p>\n\n\n\n<p>\u3000\u2462 Tedarik\u00e7inin i\u015fbirli\u011fi talebine yan\u0131t verilmesi<\/p>\n\n\n\n<p>Kullan\u0131c\u0131 taraf\u0131n\u0131n, sistemden beklenen i\u015flevleri a\u00e7\u0131k\u00e7a tedarik\u00e7i taraf\u0131na iletmeli ve aktif olarak geli\u015ftirmeye i\u015fbirli\u011fi yapmal\u0131d\u0131r.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Proje_Yonetimi_Kolay_Degildir\"><\/span>Proje Y\u00f6netimi Kolay De\u011fildir<span class=\"ez-toc-section-end\"><\/span><\/h3>\n\n\n\n<figure class=\"wp-block-image size-full is-resized\"><img decoding=\"async\" loading=\"lazy\" width=\"735\" height=\"490\" src=\"https:\/\/monolith.law\/tr\/wp-content\/uploads\/sites\/24\/2026\/04\/project-management-duties-3.jpg\" alt=\"\" class=\"wp-image-79763\" style=\"aspect-ratio:1.5;width:840px;height:auto\" srcset=\"https:\/\/monolith.law\/tr\/wp-content\/uploads\/sites\/24\/2026\/04\/project-management-duties-3.jpg 735w, https:\/\/monolith.law\/tr\/wp-content\/uploads\/sites\/24\/2026\/04\/project-management-duties-3-300x200.jpg 300w, https:\/\/monolith.law\/tr\/wp-content\/uploads\/sites\/24\/2026\/04\/project-management-duties-3-250x167.jpg 250w\" sizes=\"(max-width: 735px) 100vw, 735px\" \/><figcaption class=\"wp-element-caption\">Projenin risk y\u00f6netimini temel alarak ilerlemek.<\/figcaption><\/figure>\n\n\n\n<p>IT sisteminin, ince detaylar\u0131n birle\u015fiminden olu\u015fan bir \u015fey oldu\u011fu nokta, sadece ekran\u0131 g\u00f6ren kullan\u0131c\u0131 taraf\u0131ndan fark edilmesi zor olabilir. Ancak, sistem geli\u015ftirme projesini y\u00f6netmenin zorlu\u011funu d\u00fc\u015f\u00fcn\u00fcrken bu \u00e7ok \u00f6nemlidir. IT sisteminin bu t\u00fcr bir \u015fey olmas\u0131 nedeniyle, tedarik\u00e7i taraf\u0131ndan, ayr\u0131nt\u0131l\u0131 dikkat ile birlikte, genel resmi \u00f6zl\u00fc bir \u015fekilde d\u00fczenleme yetene\u011fi ve genel bak\u0131\u015f yetene\u011fi de talep edilir.<\/p>\n\n\n\n<p>Ekran\u0131 g\u00f6rmekle bile hayal edilemeyecek yerlerde i\u015fin zorlu\u011fu vard\u0131r ve bu ayn\u0131 zamanda projenin &#8220;alev almas\u0131n\u0131n&#8221; nedeni de olabilir. \u00d6ncelikle bu noktalar\u0131 anlamak ve &#8220;IT sistemi geli\u015ftirme projesini y\u00f6netmek kolay bir i\u015f de\u011fildir&#8221; noktas\u0131n\u0131 bilmek, proje risk y\u00f6netimi hakk\u0131nda \u00f6\u011frenme s\u00fcrecinin \u00f6n ko\u015fulu olacakt\u0131r.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Proje_Yonetimi_Yukumluluk_Ihlali_Durumunda_Ne_Olabilir\"><\/span>Proje Y\u00f6netimi Y\u00fck\u00fcml\u00fcl\u00fck \u0130hlali Durumunda Ne Olabilir?<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<figure class=\"wp-block-image size-full is-resized\"><img decoding=\"async\" loading=\"lazy\" width=\"735\" height=\"490\" src=\"https:\/\/monolith.law\/tr\/wp-content\/uploads\/sites\/24\/2026\/04\/project-management-duties-4.jpg\" alt=\"\" class=\"wp-image-79764\" style=\"aspect-ratio:1.5;width:840px;height:auto\" srcset=\"https:\/\/monolith.law\/tr\/wp-content\/uploads\/sites\/24\/2026\/04\/project-management-duties-4.jpg 735w, https:\/\/monolith.law\/tr\/wp-content\/uploads\/sites\/24\/2026\/04\/project-management-duties-4-300x200.jpg 300w, https:\/\/monolith.law\/tr\/wp-content\/uploads\/sites\/24\/2026\/04\/project-management-duties-4-250x167.jpg 250w\" sizes=\"(max-width: 735px) 100vw, 735px\" \/><\/figure>\n\n\n\n<p>Peki, proje y\u00f6netimi y\u00fck\u00fcml\u00fcl\u00fc\u011f\u00fcn\u00fcn ihlal edildi\u011fi durumlarda ne gibi sonu\u00e7lar do\u011fabilir?<\/p>\n\n\n\n<p>Bu konuda, &#8220;Proje y\u00f6netimi y\u00fck\u00fcml\u00fcl\u00fc\u011f\u00fc \u015fu \u015fekildedir&#8221; diyen net bir maddesi olan bir kanun yoktur.<\/p>\n\n\n\n<p>Ancak, ge\u00e7mi\u015fteki dava \u00f6rneklerinden, bir tedarik\u00e7inin y\u00fck\u00fcml\u00fcl\u00fck ihlali durumunda bir kullan\u0131c\u0131n\u0131n ne yapabilece\u011fi konusunda belirli bir tutum \u00e7\u0131karabiliriz.<\/p>\n\n\n\n<p>Tedarik\u00e7inin y\u00fck\u00fcml\u00fcl\u00fck ihlali durumunda, kullan\u0131c\u0131 tedarik\u00e7iden tazminat talep edebilir veya s\u00f6zle\u015fmeyi feshedebilir. Ancak, kullan\u0131c\u0131n\u0131n da bir sorunu varsa, tedarik\u00e7inin sorumlulu\u011fu olmad\u0131\u011f\u0131na karar verilebilir veya kusurlu tazminat yap\u0131labilir, bu da tazminat miktar\u0131n\u0131n azalmas\u0131na neden olabilir.<\/p>\n\n\n\n<p>\u00d6te yandan, kullan\u0131c\u0131n\u0131n i\u015fbirli\u011fi y\u00fck\u00fcml\u00fcl\u00fc\u011f\u00fcn\u00fc ihlal etmesi durumunda, bu durum i\u015fin tamamlanmamas\u0131na neden olabilir ve bu durumda risk ta\u015f\u0131ma (Japon Medeni Kanunu&#8217;nun 536. maddesi 2. f\u0131kras\u0131) veya borcun ifa edilmemesi gerek\u00e7esiyle tedarik\u00e7i, kullan\u0131c\u0131dan \u00fccret kar\u015f\u0131l\u0131\u011f\u0131 talep edebilir.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Proje_Yonetimi_Yukumlulugunu_Belirten_Yargi_Karari\"><\/span>Proje Y\u00f6netimi Y\u00fck\u00fcml\u00fcl\u00fc\u011f\u00fcn\u00fc Belirten Yarg\u0131 Karar\u0131<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<figure class=\"wp-block-image size-full is-resized\"><img decoding=\"async\" loading=\"lazy\" width=\"735\" height=\"490\" src=\"https:\/\/monolith.law\/tr\/wp-content\/uploads\/sites\/24\/2026\/04\/project-management-duties-5.jpg\" alt=\"\" class=\"wp-image-79765\" style=\"aspect-ratio:1.5;width:840px;height:auto\" srcset=\"https:\/\/monolith.law\/tr\/wp-content\/uploads\/sites\/24\/2026\/04\/project-management-duties-5.jpg 735w, https:\/\/monolith.law\/tr\/wp-content\/uploads\/sites\/24\/2026\/04\/project-management-duties-5-300x200.jpg 300w, https:\/\/monolith.law\/tr\/wp-content\/uploads\/sites\/24\/2026\/04\/project-management-duties-5-250x167.jpg 250w\" sizes=\"(max-width: 735px) 100vw, 735px\" \/><\/figure>\n\n\n\n<p>Proje y\u00f6netimi y\u00fck\u00fcml\u00fcl\u00fc\u011f\u00fcn\u00fc a\u00e7\u0131klayan temsilci bir yarg\u0131 karar\u0131 olarak a\u015fa\u011f\u0131dakiler bulunmaktad\u0131r.<\/p>\n\n\n\n<p>A\u015fa\u011f\u0131daki durum, sistem geli\u015ftirmede teslim tarihinin gecikmesi veya tedarik\u00e7inin ba\u015flang\u0131\u00e7 tahmininin \u00fczerinde bir art\u0131\u015f talep etmesi gibi nedenlerden dolay\u0131 davan\u0131n ilerlemesine neden olan bir durumdur. Kullan\u0131c\u0131 ve tedarik\u00e7inin sorumluluklar\u0131n\u0131n nas\u0131l ayr\u0131lmas\u0131 gerekti\u011fi konusunda anla\u015fmazl\u0131k, adeta bir &#8220;yang\u0131n olay\u0131&#8221; \u00f6rne\u011fi olarak adland\u0131r\u0131lan bir durumda dava s\u00fcrecine kadar ilerlemi\u015ftir.<\/p>\n\n\n\n<blockquote class=\"wp-block-quote\">\n<p>Daval\u0131, bir sistem geli\u015ftirme uzman\u0131 olarak, sahip oldu\u011fu y\u00fcksek d\u00fczeydeki uzman bilgi ve deneyimine dayanarak, bu s\u00f6zle\u015fme ve teklif belgesine uygun olarak belirtilen sistemleri olu\u015fturmal\u0131 ve belirlenen teslim tarihine kadar bu sistemleri tamamlamakla y\u00fck\u00fcml\u00fcd\u00fcr.<br>Dolay\u0131s\u0131yla, daval\u0131n\u0131n, belirtilen teslim tarihine kadar bu sistemleri tamamlamak i\u00e7in, s\u00f6zle\u015fme ve teklif belgesinde belirtilen geli\u015ftirme prosed\u00fcrlerine, y\u00f6ntemlerine ve i\u015f s\u00fcre\u00e7lerine uygun olarak geli\u015ftirme \u00e7al\u0131\u015fmalar\u0131n\u0131 ilerletmesi, s\u00fcrekli olarak ilerleme durumunu y\u00f6netmesi, geli\u015ftirme \u00e7al\u0131\u015fmalar\u0131n\u0131 engelleyen fakt\u00f6rlerin ke\u015ffedilmesine \u00e7aba g\u00f6stermesi ve bunlara uygun \u015fekilde m\u00fcdahale etmesi gerekmektedir. Ayr\u0131ca, sistem geli\u015ftirme, m\u00fc\u015fterinin g\u00f6r\u00fc\u015flerini dikkate alarak yap\u0131lan bir i\u015flem oldu\u011fundan, daval\u0131n\u0131n, m\u00fc\u015fteri olan davac\u0131n\u0131n sistem geli\u015ftirme s\u00fcrecine olan kat\u0131l\u0131m\u0131n\u0131 da uygun \u015fekilde y\u00f6netmesi ve sistem geli\u015ftirme konusunda uzman bilgiye sahip olmayan davac\u0131n\u0131n geli\u015ftirme \u00e7al\u0131\u015fmalar\u0131n\u0131 engelleyici eylemler yapmas\u0131n\u0131 \u00f6nlemek i\u00e7in davac\u0131ya y\u00f6nlendirme yapmas\u0131 gerekmektedir (bu y\u00fck\u00fcml\u00fcl\u00fckler &#8220;proje y\u00f6netimi g\u00f6revleri&#8221; olarak adland\u0131r\u0131l\u0131r).<\/p>\n<cite>Tokyo District Court, March 10, 2004 (Heisei 16)<\/cite><\/blockquote>\n\n\n\n<p>Yukar\u0131daki karar metninin \u00f6z\u00fcnden, detayl\u0131 ifadeleri veya karma\u015f\u0131k durumlar\u0131n ayr\u0131nt\u0131lar\u0131n\u0131 \u00e7\u00f6z\u00fcmlemek \u00f6nemli de\u011fildir. \u00d6nemli olan, &#8220;proje y\u00f6netimi y\u00fck\u00fcml\u00fcl\u00fc\u011f\u00fc&#8221; ifadesinin do\u011frudan kullan\u0131lmas\u0131d\u0131r. A\u00e7\u0131k\u00e7a belirtilmi\u015f bir h\u00fck\u00fcm olmasa da, mahkemenin, hukuki sorumluluklar\u0131n ayr\u0131lmas\u0131 i\u00e7in bir k\u0131lavuz olu\u015fturma \u00e7abas\u0131n\u0131 g\u00f6rebiliriz.<\/p>\n\n\n\n<p>Yukar\u0131daki karar metninin i\u00e7eri\u011fini basitle\u015ftirerek yeniden d\u00fczenleyelim ve maddeler halinde d\u00fczenleyelim. Burada bahsedilen &#8220;proje y\u00f6netimi y\u00fck\u00fcml\u00fcl\u00fc\u011f\u00fc&#8221; \u015funlar\u0131 i\u00e7erir:<\/p>\n\n\n\n<ul>\n<li>\u00d6nceden belirlenen plana (geli\u015ftirme prosed\u00fcrleri, y\u00f6ntemler, i\u015f s\u00fcre\u00e7leri vb.) uygun olarak ger\u00e7ek i\u015fleri ilerletmek<\/li>\n\n\n\n<li>Ger\u00e7ek i\u015flerin sorunsuz bir \u015fekilde ilerleyip ilerlemedi\u011fini kontrol etmek<\/li>\n\n\n\n<li>E\u011fer ger\u00e7ek i\u015flerin sorunsuz bir \u015fekilde ilerlemesi engellenirse, bu &#8220;engelleyici fakt\u00f6rlerin&#8221; ke\u015ffedilmesi ve uygun \u00f6nlemlerin al\u0131nmas\u0131<\/li>\n<\/ul>\n\n\n\n<p>Ayr\u0131ca, yukar\u0131daki \u00fc\u00e7 nokta i\u00e7in,<\/p>\n\n\n\n<ul>\n<li>Tedarik\u00e7i taraf\u0131n\u0131n tek tarafl\u0131 \u00e7abalar\u0131 yerine, gerekti\u011finde kullan\u0131c\u0131 taraf\u0131ndan uygun i\u015fbirli\u011fi talep etmek gibi, ileti\u015fim \u00e7abalar\u0131n\u0131 da ayn\u0131 anda ger\u00e7ekle\u015ftirmek<\/li>\n<\/ul>\n\n\n\n<p>gibi unsurlar\u0131 da i\u00e7eren bir genel terim olarak d\u00fc\u015f\u00fcn\u00fclebilir.<\/p>\n\n\n\n<p>Not: Sistem geli\u015ftirme, hukuki olarak genellikle bir vek\u00e2letname s\u00f6zle\u015fmesi veya bir taahh\u00fct s\u00f6zle\u015fmesi \u015feklinde yap\u0131lmaktad\u0131r. Ve bir vek\u00e2letname s\u00f6zle\u015fmesi, basit\u00e7e ifade etmek gerekirse, &#8220;bir \u00fccret kar\u015f\u0131l\u0131\u011f\u0131nda, bu \u00fccrete uygun bir hassasiyetle i\u015f yapma&#8221; anla\u015fmas\u0131d\u0131r, bu nedenle proje y\u00f6netimi y\u00fck\u00fcml\u00fcl\u00fc\u011f\u00fc de, ger\u00e7ekle\u015ftirilmesi gereken &#8220;hassasiyet&#8221; kavram\u0131 i\u00e7inde yer alabilir.<\/p>\n\n\n\n<p>Her ne kadar tart\u0131\u015fmal\u0131 bir konu olsa da, &#8220;talep edildi\u011fi gibi bir \u015fey yapma&#8221; anla\u015fmas\u0131 olan bir taahh\u00fct s\u00f6zle\u015fmesi durumunda da, proje y\u00f6netimi y\u00fck\u00fcml\u00fcl\u00fc\u011f\u00fcn\u00fcn olu\u015fabilece\u011fi d\u00fc\u015f\u00fcn\u00fclmektedir. Nedeni, daha \u00f6nce belirtildi\u011fi gibi, sistem geli\u015ftirme i\u015fleminin, bir vek\u00e2letname s\u00f6zle\u015fmesi olsun veya bir taahh\u00fct s\u00f6zle\u015fmesi olsun, proje y\u00f6netiminin \u00f6nemli oldu\u011fu bir durum olmas\u0131 ve tedarik\u00e7i taraf\u0131n\u0131n bunu ger\u00e7ekle\u015ftirmesi gerekti\u011fi d\u00fc\u015f\u00fcn\u00fclmesidir.<\/p>\n\n\n\n<p><a href=\"https:\/\/monolith.law\/corporate\/contract-and-timeandmaterialcontract\" target=\"_blank\" rel=\"noreferrer noopener\">https:\/\/monolith.law\/corporate\/contract-and-timeandmaterialcontract[ja]<\/a><\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Sozlesme_Imzalanmadan_Once_de_Yukumlu_Olabilecek_Proje_Yonetimi_Gorevlerini_Gosteren_Mahkeme_Karari\"><\/span>S\u00f6zle\u015fme \u0130mzalanmadan \u00d6nce de Y\u00fck\u00fcml\u00fc Olabilecek Proje Y\u00f6netimi G\u00f6revlerini G\u00f6steren Mahkeme Karar\u0131<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<figure class=\"wp-block-image size-full is-resized\"><img decoding=\"async\" loading=\"lazy\" width=\"735\" height=\"490\" src=\"https:\/\/monolith.law\/tr\/wp-content\/uploads\/sites\/24\/2026\/04\/project-management-duties-6.jpg\" alt=\"\" class=\"wp-image-79766\" style=\"aspect-ratio:1.5;width:840px;height:auto\" srcset=\"https:\/\/monolith.law\/tr\/wp-content\/uploads\/sites\/24\/2026\/04\/project-management-duties-6.jpg 735w, https:\/\/monolith.law\/tr\/wp-content\/uploads\/sites\/24\/2026\/04\/project-management-duties-6-300x200.jpg 300w, https:\/\/monolith.law\/tr\/wp-content\/uploads\/sites\/24\/2026\/04\/project-management-duties-6-250x167.jpg 250w\" sizes=\"(max-width: 735px) 100vw, 735px\" \/><\/figure>\n\n\n\n<p>Ayr\u0131ca, proje y\u00f6netimi g\u00f6revlerinin, s\u00f6zle\u015fme imzalanmadan \u00f6nceki a\u015famada da y\u00fck\u00fcml\u00fc olabilece\u011fi d\u00fc\u015f\u00fcn\u00fclmektedir. A\u015fa\u011f\u0131da al\u0131nt\u0131lanan mahkeme karar\u0131, s\u00f6zle\u015fme imzalanmadan \u00f6nceki a\u015famada, yani \u00e7e\u015fitli teklifler ve planlar sunuldu\u011fu a\u015famada bile, tedarik\u00e7i taraf\u0131nda proje y\u00f6netimi g\u00f6revi oldu\u011funu g\u00f6stermektedir.<\/p>\n\n\n\n<p>A\u015fa\u011f\u0131daki durum, proje yar\u0131da kalma durumu ile ilgili olup, s\u00f6zle\u015fme imzalanmadan \u00f6nceki planlama veya teklif a\u015famas\u0131ndaki eksik tahminler ve kullan\u0131c\u0131ya yap\u0131lan a\u00e7\u0131klamalar\u0131n yetersizli\u011fi nedeniyle, proje y\u00f6netimi g\u00f6revinin kabul edilip edilemeyece\u011fi tart\u0131\u015f\u0131lm\u0131\u015ft\u0131r. Genel olarak, planlama ve teklif gibi i\u015flerin, s\u00f6zle\u015fme imzalanmadan \u00f6nceki a\u015famada oldu\u011fu i\u00e7in, bu t\u00fcr bir g\u00f6revin hukuken m\u00fcmk\u00fcn olup olmad\u0131\u011f\u0131 sorun olmu\u015ftur, ancak mahkeme bunu kabul etmi\u015ftir.<\/p>\n\n\n\n<p>\u00d6nceki mahkeme karar\u0131nda belirtilen proje y\u00f6netimi g\u00f6revi anlay\u0131\u015f\u0131n\u0131n, s\u00f6zle\u015fmenin imzalanmadan \u00f6nceki a\u015famaya da uzand\u0131\u011f\u0131, a\u015fa\u011f\u0131dakini okuyarak iyi anla\u015f\u0131labilir.<\/p>\n\n\n\n<blockquote class=\"wp-block-quote\">\n<p>Planlama ve teklif a\u015famas\u0131nda, proje hedeflerinin belirlenmesi, geli\u015ftirme maliyeti, geli\u015ftirme kapsam\u0131 ve geli\u015ftirme s\u00fcresinin olu\u015fturulmas\u0131 ve tahmin edilmesi gibi, proje konsepti ve ger\u00e7ekle\u015ftirilebilirli\u011fi ile ilgili konular\u0131n genel \u00e7er\u00e7evesi belirlenir ve buna g\u00f6re, projeye e\u015flik eden riskler de belirlenir. Bu nedenle, tedarik\u00e7iden talep edilen proje tasar\u0131m\u0131 ve risk analizi, sistem geli\u015ftirmeyi s\u00fcrd\u00fcrmek i\u00e7in vazge\u00e7ilmezdir. Bu durumda, tedarik\u00e7i olarak, planlama ve teklif a\u015famas\u0131nda bile, \u00f6nerilen sistemin i\u015flevlerini, kullan\u0131c\u0131n\u0131n ihtiya\u00e7lar\u0131n\u0131 kar\u015f\u0131lama derecesini, sistem geli\u015ftirme y\u00f6ntemini, sipari\u015f sonras\u0131 geli\u015ftirme yap\u0131s\u0131n\u0131 incelemeli ve do\u011frulamal\u0131 ve bu durumdan beklenen riskleri kullan\u0131c\u0131ya a\u00e7\u0131klama g\u00f6revi vard\u0131r. Bu t\u00fcr tedarik\u00e7i do\u011frulama ve a\u00e7\u0131klama g\u00f6revleri, s\u00f6zle\u015fme imzalama s\u00fcrecindeki m\u00fczakerelerde d\u00fcr\u00fcstl\u00fck ilkesine dayanan haks\u0131z fiil hukuku g\u00f6revi olarak konumland\u0131r\u0131labilir ve tedarik\u00e7i olarak bu g\u00f6revi (bu a\u015famadaki proje y\u00f6netimi g\u00f6revi) \u00fcstlenmelidir.<\/p>\n<cite>Tokyo High Court, 26 Eyl\u00fcl 2013 (Heisei 25)<\/cite><\/blockquote>\n\n\n\n<p>Not: IT projeleri ile s\u0131n\u0131rl\u0131 olmaks\u0131z\u0131n, t\u00fcm ticari i\u015flemler ve hukuki m\u00fczakereler genelinde, s\u00f6zle\u015fme imzalanmadan \u00f6nceki a\u015famada bile, di\u011fer tarafa belirli hukuki y\u00fck\u00fcml\u00fcl\u00fcklerin oldu\u011fu d\u00fc\u015f\u00fcncesi zaten vard\u0131r.<\/p>\n\n\n\n<p>Genellikle b\u00fcy\u00fck i\u015flemler ne kadar b\u00fcy\u00fck olursa, s\u00f6zle\u015fme hedefine ula\u015fana kadar &#8220;uzla\u015fma&#8221; s\u00fcreci o kadar uzun olur. Bu s\u00fcre\u00e7te bile, di\u011fer tarafa kar\u015f\u0131 d\u00fcr\u00fcst olunmas\u0131 gerekti\u011fi konusu, en az\u0131ndan ahlaki bir konu olarak iyi anla\u015f\u0131l\u0131r. Basit\u00e7e s\u00f6ylemek gerekirse, bu t\u00fcr konular, sadece duygusal ahlaki duygularla s\u0131n\u0131rl\u0131 olmay\u0131p, hukuki olarak da anlaml\u0131d\u0131r. (A\u015fa\u011f\u0131da maddeyi al\u0131nt\u0131l\u0131yorum. Alt \u00e7izgi ekleyen yazar.)<\/p>\n\n\n\n<blockquote class=\"wp-block-quote\">\n<p>Sivil Kanun Madde 1, F\u0131kra 2<br>Haklar\u0131n kullan\u0131lmas\u0131 ve y\u00fck\u00fcml\u00fcl\u00fcklerin yerine getirilmesi, d\u00fcr\u00fcst ve samimi bir \u015fekilde yap\u0131lmal\u0131d\u0131r.<\/p>\n<\/blockquote>\n\n\n\n<p>Yukar\u0131daki i\u00e7eri\u011fi \u00f6zetleyen \u015fey, kararda &#8220;d\u00fcr\u00fcstl\u00fck ilkesi&#8221; anahtar kelimesidir.<\/p>\n\n\n\n<p>Not: Bu makalede yay\u0131nlanan mahkeme kararlar\u0131 da, bir y\u00f6n\u00fcyle, &#8220;Kullan\u0131c\u0131 taraf\u0131n\u0131n i\u015fbirli\u011fi y\u00fck\u00fcml\u00fcl\u00fc\u011f\u00fc ve tedarik\u00e7i taraf\u0131n\u0131n proje y\u00f6netimi g\u00f6revinin s\u0131n\u0131rlar\u0131n\u0131 \u00e7izmek i\u00e7in bir k\u0131lavuz&#8221; anlam\u0131na gelir. IT sistem geli\u015ftirmesinde kullan\u0131c\u0131 taraf\u0131n\u0131n i\u015fbirli\u011fi y\u00fck\u00fcml\u00fcl\u00fc\u011f\u00fc hakk\u0131nda, a\u015fa\u011f\u0131daki makaleye bak\u0131n\u0131z.<\/p>\n\n\n\n<p><a href=\"https:\/\/monolith.law\/corporate\/user-obligatory-cooporation\" target=\"_blank\" rel=\"noreferrer noopener\">https:\/\/monolith.law\/corporate\/user-obligatory-cooporation[ja]<\/a><\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Ozet_Proje_Yonetimi_Yukumluluk_Ihlali_ile_Ilgili_Sorunlar_Icin_Avukata_Danisin\"><\/span>\u00d6zet: Proje Y\u00f6netimi Y\u00fck\u00fcml\u00fcl\u00fck \u0130hlali ile \u0130lgili Sorunlar \u0130\u00e7in Avukata Dan\u0131\u015f\u0131n<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<figure class=\"wp-block-image size-full is-resized\"><img decoding=\"async\" loading=\"lazy\" width=\"735\" height=\"490\" src=\"https:\/\/monolith.law\/tr\/wp-content\/uploads\/sites\/24\/2026\/04\/project-management-duties-7.jpg\" alt=\"\" class=\"wp-image-79767\" style=\"aspect-ratio:1.5;width:840px;height:auto\" srcset=\"https:\/\/monolith.law\/tr\/wp-content\/uploads\/sites\/24\/2026\/04\/project-management-duties-7.jpg 735w, https:\/\/monolith.law\/tr\/wp-content\/uploads\/sites\/24\/2026\/04\/project-management-duties-7-300x200.jpg 300w, https:\/\/monolith.law\/tr\/wp-content\/uploads\/sites\/24\/2026\/04\/project-management-duties-7-250x167.jpg 250w\" sizes=\"(max-width: 735px) 100vw, 735px\" \/><\/figure>\n\n\n\n<p>Bu makalede, sistem geli\u015ftirmedeki proje y\u00f6netimi y\u00fck\u00fcml\u00fcl\u00fc\u011f\u00fc hakk\u0131nda genel bir d\u00fczenleme denemesi yapt\u0131k. Sistem geli\u015ftirmenin \u00e7e\u015fitli sorunlar\u0131 ve zorluklar\u0131 vard\u0131r, ancak b\u00f6yle bir durumla kar\u015f\u0131la\u015ft\u0131\u011f\u0131n\u0131zda \u00f6nemli olan, her t\u00fcrl\u00fc \u00e7at\u0131\u015fma sahnesinde ortak olan &#8216;temel&#8217; unsurlard\u0131r. Her bir d\u00fczensiz durumun kendine \u00f6zg\u00fc bir durumu olabilir ve bu durumlar sonsuz varyasyonlara sahip olabilir.<\/p>\n\n\n\n<p>Ancak, b\u00f6yle bir durumla kar\u015f\u0131 kar\u015f\u0131ya kald\u0131\u011f\u0131n\u0131zda, &#8220;ba\u015flang\u0131\u00e7ta hangi yasal y\u00fck\u00fcml\u00fcl\u00fckleri kimin ne kadar \u00fcstlendi\u011fi?&#8221; sorusunu sormak, olay\u0131n kendine \u00f6zg\u00fc \u00f6zelliklerini a\u015fan, belirli bir evrensellik ta\u015f\u0131r.<\/p>\n\n\n\n<p>Yerinde \u00e7\u00f6z\u00fcmlemelerle yetinmek yerine, yap\u0131c\u0131 sorun \u00e7\u00f6zme yakla\u015f\u0131m\u0131yla \u00e7\u00f6z\u00fcm ararken, ipu\u00e7lar\u0131 da yine yasalar ve ge\u00e7mi\u015f mahkeme kararlar\u0131nda bulunabilir.<\/p>\n\n\n\n<p>Proje y\u00f6netimi y\u00fck\u00fcml\u00fcl\u00fck ihlali ile ilgili bir sorun ya\u015fand\u0131\u011f\u0131nda, hemen bir avukata dan\u0131\u015f\u0131n.<\/p>\n\n\n\n<p><br><\/p>\n\n\n\n<p><br><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Sistem geli\u015ftirme, i\u015fi sipari\u015f eden kullan\u0131c\u0131lar ve sipari\u015fi alan sat\u0131c\u0131lar aras\u0131nda kar\u015f\u0131l\u0131kl\u0131 i\u015fbirli\u011fi gerektiren bir s\u00fcre\u00e7tir. \u015eirketlerin kulland\u0131\u011f\u0131 IT sistemlerini geli\u015ftiren projelerin t\u00fcm\u00fc, he [&hellip;]<\/p>\n","protected":false},"author":32,"featured_media":79760,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[16],"tags":[19,31],"acf":[],"_links":{"self":[{"href":"https:\/\/monolith.law\/tr\/wp-json\/wp\/v2\/posts\/61119"}],"collection":[{"href":"https:\/\/monolith.law\/tr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/monolith.law\/tr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/monolith.law\/tr\/wp-json\/wp\/v2\/users\/32"}],"replies":[{"embeddable":true,"href":"https:\/\/monolith.law\/tr\/wp-json\/wp\/v2\/comments?post=61119"}],"version-history":[{"count":4,"href":"https:\/\/monolith.law\/tr\/wp-json\/wp\/v2\/posts\/61119\/revisions"}],"predecessor-version":[{"id":79768,"href":"https:\/\/monolith.law\/tr\/wp-json\/wp\/v2\/posts\/61119\/revisions\/79768"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/monolith.law\/tr\/wp-json\/wp\/v2\/media\/79760"}],"wp:attachment":[{"href":"https:\/\/monolith.law\/tr\/wp-json\/wp\/v2\/media?parent=61119"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/monolith.law\/tr\/wp-json\/wp\/v2\/categories?post=61119"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/monolith.law\/tr\/wp-json\/wp\/v2\/tags?post=61119"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}